摘要
研究了风电场穿透功率极限的必要性,论述了求取风电场穿透功率极限的传统数字仿真法、带约束的优化算法以及频率约束法等,讨论了上述方法的优缺点。
The significance of determining wind power penetration limit in wind farm is introduced briefly,and the approaches to calculate wind power penetration limit, such as traditional digital simulation,the optimization algorithm with constraints and frequency constraint method,are separately discussed, the advantages and disadvantages of above-mentioned approaches are analyzed.h provide reference for calculation of wind power penetration limit.
出处
《电网与清洁能源》
2009年第4期45-48,共4页
Power System and Clean Energy
关键词
风电场
穿透功率极限
数字仿真
wind farm
wind power penetration limit
reference