期刊文献+

雅瑶立交主桥施工监控技术概述与成果 被引量:4

Construction control technique and the result of the main section of the Yayao overpass
下载PDF
导出
摘要 介绍了雅瑶立交主桥的施工监控技术及其主要成果,指出在雅瑶立交主桥施工监控过程中所采用的技术措施和管理流程具有很强的实用性,不仅为大桥的成功修建起了关键的作用,也为同类型大跨度预应力混凝土连续梁桥施工监控积累了一定的经验。 This paper describes the technique process and chief results of construction control for the main section of the Yayao overpass. It is shown that the critical techniques and management process adopted in the construction control of the main section of the Yayao overpass are very practical. It not only play a crucial role in the successful erection of the main section of the Yayao overpass, but also contribute to the experiences of construction control for continuous girder bridge of the same type.
机构地区 长沙理工大学
出处 《山西建筑》 2009年第15期294-295,共2页 Shanxi Architecture
关键词 施工监控 连续梁桥 立交主桥 振弦式应变计 construction control, continuous girder bridge, the main section overpass, vibrating wire sensor
  • 相关文献

参考文献2

二级参考文献2

共引文献24

同被引文献11

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部