摘要
本文主要介绍了浏阳河隧道的特点和穿越牛角冲地段施工情况,通过注浆加固和初期支护加强来优化施工方案,改变开挖工法,从而确保工程按期完成。
The Thesis aims at introducing the characteristics of Liuyanghe Tunnel as well as the section under Niujiachong. The grouting and primary support enhancement is applied to optimize the construction plan in this section so as to ensure the construction progress.
出处
《科技创新导报》
2009年第8期62-63,共2页
Science and Technology Innovation Herald
关键词
隧道
施工工艺
优化
Tunnel Construction craftsmanship optimize