摘要
以广东南海三山西桥主桥拱肋吊装施工控制的具体实践为例,介绍了该桥施工控制过程中所采用的控制原理和方法。对于确定控制目标,建立控制计算的力学模式并进行控制计算,为拱肋吊装施工提供各阶段动态控制参数等问题,进行综合分析研究,供有关技术人员参考。
Based on the construction control for the installation of main spans arch ribs in Nanhai Sanshan West Bridge, the principles and methods of the construction control are introduced. The synthetic analysis for ensuring the control goals, establishing the mechanical models and providing the dynamic control parameters of various stages for the lifting and the installation operations. This paper may be of some value to the technical staff concerned for reference.
出处
《桥梁建设》
EI
CSCD
北大核心
1998年第1期45-47,51,共4页
Bridge Construction
关键词
钢管混凝土拱桥
拱肋
吊装
施工控制
拱桥
Nanhai Sanshan West Bridge, concrete filledin steel tubular arch bridge, arch ribs, installation, construction control