期刊文献+

南海三山西桥主桥拱肋吊装施工控制 被引量:7

The Construction Control for the Installation of Main Spans ArchRibs in Nanhai Sanshan West Bridge
下载PDF
导出
摘要 以广东南海三山西桥主桥拱肋吊装施工控制的具体实践为例,介绍了该桥施工控制过程中所采用的控制原理和方法。对于确定控制目标,建立控制计算的力学模式并进行控制计算,为拱肋吊装施工提供各阶段动态控制参数等问题,进行综合分析研究,供有关技术人员参考。 Based on the construction control for the installation of main spans arch ribs in Nanhai Sanshan West Bridge, the principles and methods of the construction control are introduced. The synthetic analysis for ensuring the control goals, establishing the mechanical models and providing the dynamic control parameters of various stages for the lifting and the installation operations. This paper may be of some value to the technical staff concerned for reference.
出处 《桥梁建设》 EI CSCD 北大核心 1998年第1期45-47,51,共4页 Bridge Construction
关键词 钢管混凝土拱桥 拱肋 吊装 施工控制 拱桥 Nanhai Sanshan West Bridge, concrete filledin steel tubular arch bridge, arch ribs, installation, construction control
  • 相关文献

参考文献2

  • 1蔡绍怀.钢管混凝土结构的计算与应用[M]中国建筑工业出版社,1989.
  • 2陈哲.现代控制理论基础[M]冶金工业出版社,1987.

同被引文献70

引证文献7

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部