摘要 1000kV晋东南—南阳—荆门特高压交流试验示范工程是我国目前电压等级最高的输变电工程,其现场交接试验关系到整个工程是否顺利投运。文章研究了特高压晋东南变电站1000kV变压器带局部放电测量的长时感应耐压现场试验,介绍了试验的标准、程序、试验方法以及主要试验设备参数的选择,提出了综合抗干扰措施和过程监测技术手段,确保了试验的顺利进行,为特高压交流变压器的顺利投运提供了有力的技术保障。 The 1 000 kV power transmission pilot project from Southeast Shanxi via Nanyang to Jingmen is the power transmission and transformation project with the highest voltage class in China, and the results of its on-site handover tests directly relate to whether the whole project could be put into operation without a hitch. In this paper, the on-site long-duration induced ac voltage withstand test with partial discharge measurement of 1000kV transformer is researched; the standard, procedures, test methods and parameter selection of main testing devices are presented. The comprehensive anti-interference measures and technological means for process monitoring are proposed during the on-site tests to ensure the tests could be carried out smoothly and offer powerful technical support to successfully put 1000 kV main transformer into operation.
出处 《电网技术》 EI CSCD 北大核心 2009年第10期34-37,共4页 Power System Technology
关键词 1 000kV主变压器 感应耐压试验 局部放电 现场试验 1 000 kV main transformer induced AC voltage withstand test partial discharge on-site test
  • 相关文献

参考文献12

二级参考文献57

共引文献418

同被引文献151

引证文献16

二级引证文献136

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部