高层与多层叠合部位的沉降处理

Sedimentation management in high-level and multi-layer composite parts
下载PDF
导出
摘要 介绍了某高层1号楼与多层3号楼沉降部位的处理方案、采用的施工方法、施工过程、信息化监控措施等,并对处理效果进行了评价,指出高层1号楼与多层3号楼基础采用设置隔离层,达到了分开沉降的目的,既节约了工期,又降低了成本。 The article introduces management scheme of sedimentation part in a high-level building' s 1 # department and 3 # department of a multilayer building, it also introduces constructional methods, constructional process, as well as surveillance and control measures of information. It also evaluates the management effects. It points that useing install isolation layer for high-level building' s 1# department and 3 # department of a multilayer building, achieve the goal of separate settlement, both save the time limit for a project and cost down.
作者 缪军
出处 《山西建筑》 2009年第16期123-125,共3页 Shanxi Architecture
关键词 分开沉降 隔离层 防水层 施工监测 separate settlement, isolation layer, waterproof layer, construction supervision