摘要
该文介绍了木灵高架桥的工程概况和地质情况,对于施工过程中遇到的溶洞处理方法作了简单介绍。重点介绍了特殊溶洞的处理方法。
The article introduces the general situation and the geologic condition of Muling Elevated Bridge,briefly introduces the treatment method of limestone cave met in the course of construction,and focuses introduction on the treatment methods of special limestone cave.
出处
《城市道桥与防洪》
2009年第5期124-126,共3页
Urban Roads Bridges & Flood Control
关键词
桩基
岩溶
特殊溶洞处理
钢护筒
湖南省
pile foundation,karst,treatment of special limestone cave,steel casing,Hunan Province