某工程边坡蠕滑机理与监测资料分析 被引量:26

ANALYSES ON MONITORING DATA AND CREEPING MECHANISM FOR THE HILLSIDE OF A PROJECT
下载PDF
导出
摘要 某坑口电站因山坡蠕滑变形,导致电厂建筑物变形开裂破坏。经工程治理后,缓解了蠕滑变形,但近几年的监测资料表明,累积变形仍将严重影响电厂的安全运行。通过分析其蠕滑机理和现场监测资料提出了今后防治该山坡蠕滑宜采取的措施。 Owing to hillside creep at sliding, a power station near the pit of coal mine has deformed and cracking destruction has been caused. The monitoring data in recent years show accumulated deformation will still affect the normal operation of the power station though creeping deformation has been mitigated after some engineering measures are taken. The creeping mechanism and site monitoring data are analysed, and some engineering measures have been taken to stop the sliding.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 1998年第2期133-139,共7页 Chinese Journal of Rock Mechanics and Engineering
关键词 蠕滑机理 监测资料 开裂破坏 电厂 治理 边坡 creeping mechanism, monitoring data, cracking destruction
  • 相关文献

参考文献2

同被引文献281

引证文献26

二级引证文献564

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部