4[1]Cooper DF,CHAPPMAN CB.Risk analysis for large projects-models,methods and cases[M].John Wiley Sons,New York,1987.
5[2]Mustafa MA,Al-Bahar JF.Project risk assessment using the analytic hierarchy process [J].IEEE Transaction on Engineering Management.1991,38(1):46-52.
6[3]Charoenngam C,Yeh C Y.Contractual risk and liability sharing in hydropower construction [J].International Journal of Project Management,1999,17(1):29-37.
7[4]CHAPMAN CB, DALE F COOPER.Risk Engineering Basic Controlled Interval and Memory Models[J].J Opl Res Soc 1983,134(1):51-60.
8[5]CHAPMAN CB.A risk engineering approach to project risk management [J].Intermational Journal of ,Project Management,1990,18(1):5-16.
9[6]CHAPMAN CB.Large Engineering Project Risk Analysis[J].IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT,1983,V26(1):51-60.
1Marc J LeClere, The Occurrence and timing of events: Survival Analysis Applied to the study of Financial Dsitress [D]. Journal of Accounting Literature 2000(19) 158-159.