期刊文献+

基于部分延期付款的供需一体化库存模型研究 被引量:6

Study on the Integrated Manufacturer-retailer Cooperative Inventory Model with Partially Permissible Delay in Payments
下载PDF
导出
摘要 针对存在部分延期付款的一体化库存模型展开研究。假设供应链内存在唯一的生产商和唯一的零售商,生产商提供商业信用给零售商,并且零售商需要在收到订货后,立即交付部分货款,而联合决策模型的目标是确定最优的生产批量及订货周期使得供应链的总成本最低。通过建立该问题的数学模型,讨论了每种情况下解的性质,并以此为基础,给出了相应的求解算法对该一体化决策模型进行了求解。最后,通过数值算例详细说明了所得结论。 An integrated cooperative inventory model with partially permissible delay in payments was studied. Considering a single manufacturer and a single retailer integrated supply chain, the manufacturer offers retailer a trade credit period, and the retailer must make a partial payment when the order is filled. The objective is to determine the manufacturer' s optimal batches and the retailer' s optimal order cycle to minimize the joint total cost per unit time. First a mathematical model was developed, and then the characteristics of the solutions were discussed under every scenario. A solution algorithm was presented to find the optimal solution. Finally, numerical examples were conducted to illustrate the effectiveness of the proposed model.
出处 《预测》 CSSCI 北大核心 2009年第3期75-80,共6页 Forecasting
基金 国家自然科学基金资助项目(70871097)
关键词 供应链 库存 一体化模型 部分延期付款 supply chain inventory integrated model partially permissible delay in payments
  • 相关文献

参考文献18

  • 1Goyal S K. An integrated inventory model for a single supplier-single customer problem[ J ]. International Journal of Production Research, 1976, 15( 1): 107-111.
  • 2Banerjee A. A joint economic-lot-size model for purchaser and vendor[J]. Decision Sciences, 1986, 17: 292-311.
  • 3Goyal S K. A joint economic-lot-size model for purchaser and vendor: a comment[J]. Decision Sciences, 1988, 19 : 236-241.
  • 4Goyal S K, Nebebe F. Determination of economic production-shipment policy for a single-vendor-single-buyer system[ J ]. European Journal of Operational Research, 2000, 121(1): 175-178.
  • 5Kim S L, Ha D. A JIT lot-splitting model for supply chain management: enhancing buyer-supplier linkage [ J ]. International Journal of Production Economics, 2003, 86: 1-10.
  • 6Pan J C H, Yang J S. A study of an integrated inventory with controllable lead time [ J ]. International Journal of Production Research, 2002, 40 ( 5 ) : 1263-1273.
  • 7Chang H C, Ouyang L Y, Wu K S, et al.. Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction[ J]. European Journal of Operational Research, 2006, 170(2) : 481-495.
  • 8陈志刚,徐渝,贾涛.基于非线性提前期成本的库存问题研究[J].预测,2007,26(1):64-69. 被引量:3
  • 9Zhou Y W, Wang S D. Optimal production and shipment models for a single-vendor-single-buyer integrated system [ J]. European Journal of Operational Research, 2007, 180( 1 ) : 309-328.
  • 10Rau H, Ouyang B C. An optimal batch size for integrated production-inventory policy in a supply chain [ J ]. European Journal of Operational Research, 2008, 185 (2) : 619-634.

二级参考文献14

  • 1Schonberger R.Japanese manufacturing techniques[M].The Free Press,New York,1982.
  • 2Liao C J,Shyu C H.An analytical determination of lead time with normal demand[J].International Journal of Operations Production Management,1991,11:72-78.
  • 3Ouyang L Y,Yeh N C,Wu K S.Mixture inventory model with backorders and lost sales for variable lead time[J].Journal of the Operational Research Society,1996,47:829-832.
  • 4Moon I,Choi S.A note on iead time and distributional assumptions in continuous review inventory models[J].Computers & Operations Research,1998,25 (11):1007-1012.
  • 5Moncer H,Mohamed B D.Some stochastic inventory models with deterministic variable lead time[J].European Journal of Operational Research,1999,113:42-51.
  • 6Peter C,Yang K L,Chen P S.Improved inventory models with service ievel and iead time[J].Computers & Operations Research,2005,32:285-296.
  • 7Ouyang L Y,Wu K S,Ho C H.Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time[J].International Journal of Production Economics,2004,92:255-266.
  • 8Ben-Day M,Hariga M.Integrated single vendor single buyer model with stochastic demand and variable lead time[J].International Journal of Production Economics,2004,92:75-80.
  • 9Ouyang L Y,Chen C K,Chang H C.Lead time and ordering cost reductions in continuous review inventory systems with partial backorders[J].Journal of the Operational Research Society,1999,50:1272-1279.
  • 10Ouyang L Y,Chen C K,Chuang H C.Quality improvement,setup cost and lead-time reductions in lot size reorder point models with an imperfect production process[J].Computers & Operations Research,2002,29:1701-1717.

共引文献2

同被引文献36

引证文献6

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部