摘要
简要介绍了顾南矿进风井冻结工程施工方案、钻孔施工、运行情况,总结了施工中的一些经验和不足之处,为今后类似地层的井筒施工提供借鉴。
Introduced briefly Gu Qian mine the south intake shaft freeze project construction plan, the drill hole construction, the movement situation, summarized in construction scene experiences and the deficiency, will provide the model for the next similar stratum shaft construction.
出处
《山东煤炭科技》
2009年第2期12-12,14,共2页
Shandong Coal Science and Technology
关键词
冻结
施工工艺
free
construction technology