3Al-Jibouri,Saad,Monitoring Systems and their Effectiveness for Project Control in Construction[J].International Journal of Proj ect Management,2003,21 (6):145 -154.
4Anbari,Frank T.,Earned Value Project Management Method and Extensions[J].Project Management Journal,2003,34(4):12-23.
5Wafa Alsakini,Proactive schedule management of industrial turnkey projects in developing countries[J].International Journal of Project Management,2004,22:75-87.
6Bower,D.C.Phase Earned Value Analysis[C].Paper presented at the PMI Global Congress North America,Toronto,Canada.September,2005.
7Ricardo Viana Vargas,Earned Value Analysis in Control of Project:Success or Failure[J].AACE International Transactions,2003,21 (4):211-214.
8Fleming&Koppelman,Earned Value Project Mangement.3rd Ed[M].Newton Square:Project Management Institute,2005.
9Rodney Howes,Improving the Performance of Earned Value Analysis as a Construction Project Management Project Management Tool[J].Engineering,Construction and Management,2000,7 (4):399-411.
10Fleming&Keppelman,Earned Value Management:Mitigating the Risks Associated with Construction Projects[J].Cost Engineering,2002,9(4):32-36.