5Wa'el Alaghbari,Mohd.Razali A.Kadir,Azizah Salim and Ernawati.The significant factors causing delay of building construction projects in Malaysia[J].Engineering,Construction and Architectural Management,2007,14(2):192-206.
8FARID F,BOYER L T. Fair and Reasonable Markup (Farm) Pricing Model [ J ]. Journal of Construction Engineering and Management, 1985, 111(4) : 374 - 390.
9STAGER, D K. Organizing and Managing a Finance- Design-Build Project in Turkey: Fourth Roebling Lecture, 1995[J ]. Journal of Construction Engineering and Management, 1996, 122 (3): 199-204.
10BARNES M. CESMM3 Handbook: A Guide to the Financial Control of Contracts Using the Civil Engineering Standard Method of Measurement [ M ]. London: Thomas Telford, 1992.