摘要
循环流化床(CFB)锅炉脱硫系统普遍存在运行不稳定的问题。分析了影响CFB锅炉脱硫系统运行的主要因素,包括石灰石品质、入炉煤煤质、石灰石输送系统、锅炉运行参数等。对此,从设计、调试和运行管理等方面提出了具体的解决措施。
Unstable operation is a common problem faced by desulfuriztion system of CFB boiler. This paper analyzed the main factors influencing stable operation of desulfuriztion system of CFB boiler,including limestone quality, quality of as - fired coal,limestone feed system and boiler operation parameters. The paper concludes with specific countermeasures in terms of design,commissioning and operation management.
出处
《热力发电》
CAS
北大核心
2009年第5期45-47,共3页
Thermal Power Generation
关键词
CFB锅炉
脱硫系统
污染物排放
调试
CFB boiler, desulferization system, pollutant emission, commission