港珠澳大桥融资模式选择分析 被引量:5

Analysis of Financing Mode Selection for Gang-Zhu-Au Bridge
原文传递
导出
摘要 目前,人们过于关注PPP模式的优点,而忽视它的缺点以及优点的发挥需要的基础环境条件。本文以港珠澳大桥为背景,分别从私人投资者、政府以及PPP运行环境三个方面,对大桥融资模式的选择作出论述。 Now, the merits of PPP are paid close attention to, but its shortcomings and the foundation environmental conditions which the merit.display needs are neglected. This article takes the Gang-Zhu-Au Bridge as the background, and makes the elaboration to the bridge financing mode's choice from the view of private investor, government as well as the PPP running environment separately.
出处 《建筑经济》 2009年第6期26-30,共5页 Construction Economy
关键词 PPP 融资模式 效益 PPP financing mode benefit
  • 相关文献

参考文献17

  • 1NAO. Modernizing construction [R].Reported by the Comptroller and Auditor General, National Audit Office, London, 2001.
  • 2NAO. Managing the relationship to secure a successful partnership in PFI projects [R]. Reported by the Comptroller and Auditor General, National Audit Office, London, 2001.
  • 3NAO. PFI: construction performance [R]. Reported by the Comptroller and Auditor General, National Audit Office, London, 2003.
  • 4Ezilike E I, Perry J G, Hawash K. The barriers to entry into the PFI market [J]. Engineering, Construction and Architectural Management, 1997(3):179-193
  • 5AusCID. Australia at a crossroads-public/private partnerships or perish? Finance and legal issues [EB/OL]. The Australian Council for Infrastructure Development, Available from http://www.auscid.org.au/.
  • 6Marcus A and Graemebowles. Public-private partnership and contract negotiations: an empirical study [J]. Construction Management and Economics,2004 (3) : 26-87.
  • 7Saunders A. Aspects of funding for BOO projects[J]. Engineering, Construction and Architectural Management,1998 ( 1 ) :22-30.
  • 8Birnie J. Public Finance Initiative (PFI)-UK construction industry response[J]. Journal of Construction Procurement, 1999(1):5-14.
  • 9Huber B. PPP for the development of social service[EB/OL]. Handbook of the Campus on Public-Private Partnership for Sustainable Development, Available from http:// www. unitar.org/.
  • 10Li B, Akintoye A, Edwards P J, Hardcastle C. Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK[J]. Engineering, Construction and Architectural Management,2005 (2):125-148.

共引文献9

同被引文献32

  • 1王艺红.浅谈我国基础设施建设中的项目融资[J].科技经济市场,2007(4). 被引量:1
  • 2肖条军,盛昭潮,周晶.交通BOT项目投资的对策分析[J].经济数学,2002,19(4):40-46. 被引量:7
  • 3秦旋.基于CAPM的BOT项目特许期的计算模型[J].管理工程学报,2005,19(2):60-63. 被引量:52
  • 4吴泗宗,顾明毅.对我国基础设施多元化融资的研究[J].价格理论与实践,2005(11):51-52. 被引量:8
  • 5Min CL. Contract design of private infrastructure concessions [ D ]. University of California, Berkeley ,2000.
  • 6Mills G. Welfare and profit divergence for a tolled link in a road network[ J]. Journal of Transport Economics and Policy, 1995,29:137 - 146.
  • 7Kumarsawamy MM, Zhang XQ. Governmental role in BOT-led infrastructure development [ J ]. International Journal of Project Management ,2001,19 : 195 - 205.
  • 8Shen LY,Li QM. Alternative concession model for build operate transfer contract projects [ J ]. Journal of Construction Engineering and Management, 2002,128 ( 4 ) : 326 - 330.
  • 9Shen LY, Wu YZ. Risk concession model for build operate transfer contract projects [ J ], Journal of Construction Engineering and Management,2005,131 ( 2 ) :211 - 220.
  • 10Che YK. Design competition through multidimensional auctions [ J ]. ROAND 1ournal of Economics, 1993,24:668 - 680.

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部