摘要
结合某大厦地下连续墙施工,阐述了地下连续墙施工中存在的技术性难点,指出地下连续墙施工过程中只要根据各工序的施工要点采取相应的预控措施并强化质量控制,就能减少施工质量问题,从而保证工程取得成功。
The paper combines underground diaphragm wall in some mansion construction, expatiates the under construction and existent technique difficult in underground diaphragm wall, points out the underground continuous wall construction process inside as long as adopts and prepares to control the measure homologously according to the construction important point of each work preface and enhance the quantity control, can reduce the construction quantity problem, to guarantee the engineering acquisition the success.
出处
《山西建筑》
2009年第17期79-81,共3页
Shanxi Architecture
关键词
地下连续墙
导墙
混凝土浇筑
the underground diaphragm wall, leading wall, concrete sprinkle and build