摘要
结合保沧高速K42+419现浇连续箱梁施工情况,阐述了满堂式支架在现浇混凝土连续箱梁施工中的应用,实践证明:只要采取合理的支架搭设方案,就可以保证现浇箱梁的支架安全、稳定及梁体施工质量。
Combining construction situation of cast-in-place continuing box beam in Bao-Cang highway K42 + 419, the paper states application of entire hall girder in construction of cast-in-place concrete continuing box beam. It has been proved by the practice that safety of girder, stability and beam' s construction quality of the cast-in-place box beam could be ensured as long as reasonable supporting scheme is been adopted.
出处
《山西建筑》
2009年第17期122-123,共2页
Shanxi Architecture
关键词
满堂式支架
现浇箱梁
地基处理
支架布设
entire hall girder, cast-in-place box beam, dealing of foundation, fixing up of girder