摘要
从施工前的准备工作、征拆迁工作、合同管理工作、台账记录工作等方面,对招标工程如何通过管理手段进行有效地投资控制进行了探讨,并提出了具体的建议,从而使有限的资金发挥更大的经济效益。
From preparation work, removal and demolition work, contract management work, accounting work and other aspects before construction the question that how to realize effective control of investment by management means in bid invitation is discussed, at the same time concrete suggestions are proposed, in order to make full use of limit funds to acquire maximum economic benefits.
出处
《山西建筑》
2009年第17期240-241,共2页
Shanxi Architecture
关键词
招标工程
投资
控制
bid invitation engineering, investment, control