摘要
结合温福铁路莲花岗大桥连续梁桥的现场施工实例,对连续梁桥施工的挠度监测方法进行了系统的阐述,并具体分析了莲花岗大桥各个施工阶段的变形,为施工过程的挠度控制提供了科学依据。
Combination Wen-Fu railway Lianhuagang Bridge continuous girder bridge construction site examples, for the construction of continuous girder bridge deflection monitoring methods are systematically expounded and specific analysis of the Lianhuagang Bridge all the construction phase of deformation, for the construction proess of the deflection control a scientific basis.
出处
《山西建筑》
2009年第17期293-294,共2页
Shanxi Architecture
关键词
连续梁桥
挠度
监测
控制
continuous girder bridge, deflection, monitoring, control