摘要
文中通过对丰满发电厂5号尾水闸墩的稳定性分析,为其改造工程的安全施工提供了依据。
The stability analysis on#5 drift-gate pillars of Fengman power plant in this paper provides the basis of safety construction for its reform engineering.
出处
《东北电力技术》
1998年第5期7-9,共3页
Northeast Electric Power Technology