期刊文献+

IEC 61508的合规-意味的不仅仅是Pfd!

Compliance to IEC 61508 Means More Than Just Pfd!
下载PDF
导出
摘要 IEC61508引入并提倡安全生命周期的概念,对系统集成商而言,IEC61508的合规意味的绝不仅仅是简单满足硬件的Pfd(要求时的失效概率)值。一套经第三方权威认证的体制化的功能安全管理系统(FSMS)是确保功能安全项目顺利实施的有效保证。简要介绍建立功能安全管理系统的重要性和必要性,讲述ABB公司正在全球向其指定的安全执行中心(SEC)推广实施的建立经TüV认证、满足IEC61508和IEC61511要求的功能安全管理系统的战略举措。 IEC 61508 introduces and promotes a safety life cycle concept, for system integrator compliance to IEC 61508 means more than just a Pfd (Probability of Failure on Demand). To install a Functional Safety Management System (FSMS) certified through an accredited 3rd-party organization is an effective way to safeguard implementation of a functional safety project. This paper addresses the importance and necessity of a FSMS establishment, and talks about the on-going ABB global initiatives on setting up TUV certified FSMS for a number of selected Safety Execution Centers in line with IEC 61508 and IEC 61511.
出处 《中国仪器仪表》 2009年第5期40-43,共4页 China Instrumentation
  • 相关文献

参考文献6

  • 1"Recommendations on the design and operation of fuel storage sites"; Buncefield Major Incident Investigation Board: http:// www.buncefieldinvestigation.gov.uk/reports/ recommendations.pdf.
  • 2"The Report of the BP US Refineries Independent Safety Review Panel" (concerning the Texas City incident), http://www.csb.gov/completed_ investigations/docs/Baker_panel_report.pdf.
  • 3OSHA position on IEC 61511: Stated in a letter from OSHA to ISA dated 29 November 2005. (Permission to state the content of the letter obtained from ISA).
  • 4Competence Criteria for Safety-Related System Practitioners. Guidance provided by the IET in collaboration with the HSE and BCS. Revision published 2006. Available from:<< http://www. theiet.org/publishing/books/policy/comp-crit. cfm>>.
  • 5曾硕巍.ABB安全解决方案[J].中国仪器仪表,2008(4):85-88. 被引量:4
  • 6Stuart Nunns.一个用于取得符合IEC 61508组织性功能安全认证的方法论 第一部分:制定策略和确定实施范围[J].仪器仪表标准化与计量,2008(3):25-28. 被引量:3

二级参考文献5

  • 1王春喜.过程工业部门仪表型安全系统的功能安全[J].仪器仪表标准化与计量,2005(6):1-3. 被引量:15
  • 2ARC "Distributed Control Systems Worldwide Outlook Market Analysis and Forecast Through 2011", Larry O'Brien, 2007.
  • 3ARC "Automation Supplier Provided Services Worldwide Outlook Market Analysis and Forecast Through 2011", Larry O'Brien, 2007.
  • 4ARC "Safety and Critical Control World Wide Outlook 2006".
  • 5ARC INSIGHTS INSIGHT# 2006-17MPH APRIL 13, 2006 "Need for Cost Effective Systems Drives Safety and Control Integration", Asish Ghosh.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部