介绍了某35 kV送电线路工程采用非开挖定向钻孔技术进行YJV62-35 1×300电力电缆穿越城区敷设施工的方法。该方法在保护地面设施的前提下,避开地下管线,实现了在一些无法实施开挖作业的地区敷设电力电缆。
This paper introduces the application of non surface duct digging directional underground hole boring technology for a certain 35kV power line project. Under the precondition of protecting the surface structures and avoiding other utility pipes and lines underneath the ground surface, the project of YJV62-35 1 × 300 power line penetrating the urban area is carried out. This practice realizes the laying of electric power supply lines in areas where open duct digging is not practical.
出处
《中国煤炭》
北大核心
2009年第5期66-67,共2页
China Coal
关键词
非开挖铺管
牵引力计算
管道填充
non open duct digging for pipe laying, traction force calculation, pipe filling