摘要
以某市"港务局7-1#料仓"工程施工为例,探讨钢筋混凝土矩形筒仓配筋设计与钢筋安装施工的协调性及一些重点部位构造建议。
In the case of the project construction of No7 - 1 silo in the local Port Authority, this paper explores the coordination of the reinforcement design of concrete rectangular silo and the construction of the reinforcing steel bar installment, and also some suggestions on structure of some key parts.
出处
《安徽冶金科技职业学院学报》
2009年第2期49-51,共3页
Journal of Anhui Vocational College of Metallurgy and Technology
关键词
料仓工程
配筋设计
施工探讨
silo project
reinforcement design
construction cliseussion