期刊文献+

基于资源优化策略的型号产品工艺任务规划 被引量:2

Process assignment planning of space product based on resource optimization strategy
下载PDF
导出
摘要 针对型号产品研制过程中工艺任务规划的特点,从工艺资源专业匹配和负荷均衡的角度,建立了基于资源优化的工艺任务分配问题的描述模型,给出了模型的求解思路。提出了基于经验的工艺任务量估算方法、工艺资源的负荷指数和可靠性指数估算方法,解决了型号研制过程中负荷均衡和资源可靠性兼顾的工艺任务分配问题。最后,通过实例验证了该方法的可行性。 Aiming at characteristics of process assignment planning in space product development process, an expression model of process assignment planning on resource optimization strategy was established from perspectives of load balancing and professional resource matching. And both the load balance and resources reliability were taken into consideration in the model. In addition, a solution was addressed to sovle the model. And then, estimation methods of process task workload, load index and resource reliability index were proposed based on experiences. Therefore, the process assignment problems in product development both considered load balancing and resource reliability were resolved. Finally, an case was introduced to validate the feasibility of these methods.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2009年第5期998-1003,共6页 Computer Integrated Manufacturing Systems
关键词 资源优化 任务规划 可靠性 负荷均衡 映射模型 resource optimization assignment planning reliability load balancing mapping model
  • 相关文献

参考文献14

  • 1邱福生,刘文剑.型号研制过程的工艺分工规划建模技术研究[J].计算机集成制造系统,2007,13(8):1519-1527. 被引量:6
  • 2WANG K L,JIN Y.Modcling dependencies in engineering design[C]//Proceedings of ASME Design Theory and Methodology Conference.Las Vegas,Nev.,USA:ASME,1999:36-45.
  • 3TANG Dunbing,ZHENG Li,LI Zhizhong,et al.Re-engineering of the design process for concurrent engineering[J].Computers & Industrial Engineering,2000,38(4):479-491.
  • 4SU J C,CHEN S J,LIN L.A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering design[J].Computers & Industrial Engineering,2003,45(1):195-214.
  • 5周雄辉,李祥,阮雪榆.注塑产品与模具协同设计任务规划算法研究[J].机械工程学报,2003,39(2):113-118. 被引量:43
  • 6REIJERS H A.Design and control of workflow processes:business process management for the service industry[J].Lecture Notes in Computer Science.2003,2617:30-36.
  • 7邱福生,刘文剑.基于映射分解的产品开发过程建模技术研究[J].计算机工程与应用,2006,42(4):114-117. 被引量:3
  • 8玄光男 程润伟.遗传算法与工程优化[M].北京:清华大学出版社,2004..
  • 9HEALY W C.Multiple choice programming,a procedure for linear programming with zero-one variables[J].Operations Research,1964,12(1):122-138.
  • 10GEOFFRION A M.Lagrangian relaxation for integer programming[J].Mathematical Programming,1974,2:82-114.

二级参考文献17

  • 1田锡天,张振明,仝春民.面向网络化制造的工艺分工规划技术研究[J].计算机集成制造系统,2005,11(8):1099-1103. 被引量:7
  • 2邱福生,刘文剑.基于映射分解的产品开发过程建模技术研究[J].计算机工程与应用,2006,42(4):114-117. 被引量:3
  • 3邱福生,刘文剑.基于多智能体的网络协同产品数据管理技术研究[J].计算机集成制造系统,2006,12(5):702-708. 被引量:11
  • 4Roach,Gregory Mark.The product design generator:A next-generation approach to detailed design[D].Dissertation Abstracts International, 64-02:0926.
  • 5ANN Arbor. cPDM:the key to harnessing innovation in an ebusiness world [EB/OL]. http://www. CIM- data. com/PLM/cpdm. html, 2004- 09.
  • 6CIMdata Inc.. Collaborative product definition management(cPDM) : an overview[EB/OL]. http://www. cimdata. com/publications/cPDm_Def. pdf, 2004 - 09 - 30.
  • 7LEE H,KIM S S.Integration of process planning and scheduling using simulation based genetic algorithms[J].The International Journal of Advanced Manufacturing Technology,2001,18(8):586-590.
  • 8KEMPENAERS J,PINTE J,DETAND J,et al.A collaborative process planning and scheduling system[J].Advances in Engineering Software,1996,25 (1):3-8.
  • 9EISAYED A E,EIWANY M H.(PPP):a hybrid system for integrating process and production planning in batch part manufacturing[J].Journal of Materials Processing Technology,1996,61(1):113-119.
  • 10LEE R S,CHEN Y M,CHENG H Y,et al.A framework of a concurrent process planning system for mold manufacturing[J].Computer Integrated Manufacturing Systems,1998,11(3):171-190.

共引文献450

同被引文献26

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部