摘要 根据广州蓄能水电厂稳定控制系统的功能、作用、存在问题,论述了广州蓄能水电厂稳定控制系统改造的必要性和改造措施。针对改造后所取得的效果,提出了由南方电网罗洞稳定控制主站直接切除蓄能水电厂抽水泵负荷的建议,节省转发命令的时间,电网稳定控制效果会更好。 Based on the function, role and problems of the stability control system in Guangzhou Pumped Storage Power Station, the transformation necessity and measures to the system are discussed. In light of the transformation effects, it is proposed that the pump load of Guangzhou Pumped Storage Power Station be directly shed by the Luodong stability control master station of China Southern Power Grid, thereby saving time for forwarding orders and improving the effects of stability control of power network.
出处 《广东电力》 2009年第5期53-55,88,共4页 Guangdong Electric Power
关键词 稳定控制系统 蓄能水电厂 机组 抽水泵 stability control system pumped storage power station unit pump
  • 相关文献

参考文献1

  • 1李杨絮,杨银国,向丽玲,等.广东电网2008年度稳定计算报告[R].广州:广东省电力调度中心,2008.

同被引文献12

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部