First Box Girder in Shiwu Project Successfully Grouted
First Box Girder in Shiwu Project Successfully Grouted
出处
《轨道交通》
2009年第5期19-19,共1页
Rail Transit
-
1Texworld Fully Booked for the September Show[J].China Textile,2013(8):46-48.
-
2于志强,王旭,吴兴序.Grouted Pile and Its Bearing Capacity[J].Journal of Modern Transportation,2000,17(1):25-32.
-
3XijunYin.Study on the Mechanical Properties of Irregular Curved Steel Box Girder for City Viaduct[J].International Journal of Technology Management,2014(1):46-48.
-
4LIU Xin.Discussion Based on Formwork Construction of Box Girder Formwork Design Scheme[J].International English Education Research,2016(4):66-68.
-
5Fully Serviced[J].China International Business,2006(5).
-
6Qi WANG Haili LIAO Mingshui LI Cunming MA.Influence of aerodynamic configuration of a streamline box girder on bridge flutter and vortex-induced vibration[J].Journal of Modern Transportation,2011,19(4):261-267. 被引量:9
-
7中冶完成全球首台AP1000核电机组核岛灌浆工程[J].国际工程与劳务,2010(2):58-59.
-
8陈利.灌浆防水 堵漏专家[J].现代营销(信息版),2007,0(7):21-21.
-
9李茂峰.安徽蚌埠:三百万亩小麦丰收在望[J].农产品市场,2006(19):32-32.
-
10王沐寒.三灵高速公路黄土状低液限粉土地质条件下路区内溶洞处理方法[J].经济技术协作信息,2014(11):103-103.