期刊文献+

考虑修理延误情况下的最优维修策略 被引量:2

Optimal functional inspection policy with considering delay of repair
下载PDF
导出
摘要 研究了具有修理延误情况的产品维修决策问题,运用概率和随机过程原理建立了产品故障模型和寿命周期费用模型。提出了以经济性为目标的检查与修理优化策略,分析了功能检查间隔期最优解的性质。该模型适用于分析在非周期性检测条件下的维修策略,可同时优化检查间隔期和修理延误时间。提出了一种基于迭代的优化算法,给出了应用该方法的具体步骤,并通过示例说明了该模型的求解过程和算法的有效性。 The problem of decision-making on functional inspection for a component with delayed repair is studied. The models of failures and life cycle cost are developed using probability and stochastic process. An optimal policy of inspection is presented with an economic objective, and the property of solution to the intervals of inspection is studied. The model is applicable to analyze maintenance policy under non-periodic inspection, and optimize the inspection intervals and the delay of repair together. An algorithm for optimizing the policy is presented using the method of iteration, and procedure for using the methodology is also presented. At last, an ex ample is given to show the process of solving the problem and verification of the algorithm.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2009年第5期1255-1258,共4页 Systems Engineering and Electronics
基金 装备预研重点基金资助课题(9140A27020308JB34)
关键词 检查策略 故障 维修 优化 inspection policy failure maintenance optimization
  • 相关文献

参考文献6

  • 1Moubrary J. Reliability centred maintenance[M]. New York: Industrial Press Inc , 1992.
  • 2Park Y S. Optimal continuous-wear limit replacement under pe riodic inspections[J].IEEE Trans. on Reliability, 1988, 37 (1) :97 - 102.
  • 3Christer A H, Waller W M. Reducing production downtime using delay time analysis[J]. Journal of Operational Research Society, 1984, 35 (6):499 - 512.
  • 4Wang W, Christer A H. Solution algorithm for a non-homogeneous multi component inspection model[J]. Computers & Operational Research, 2003, 30 (1):19 - 34.
  • 5Zhao J, Chan AH, Roberts C. Reliability evaluation and optimization for non-homogeneous systems under imperfect inspection [J]. Reliability Engineering and System Safety, 2007,92 (1):65 -73.
  • 6赵建民,王云峰.两阶段功能检查模型研究[J].系统工程与电子技术,2000,22(12):49-51. 被引量:14

二级参考文献1

  • 1王立群,装备预防性维修大纲的制订要求与方法实施指南,GJB1378-92,1993年

共引文献13

同被引文献14

  • 1吕文元,郑睿.基于时间延迟维修理论检查模型的比较研究[J].管理科学,2007,20(1):18-21. 被引量:8
  • 2倪爱伟,谢里阳,翁刚,吴克勤,闫骏.神经网络求解隐蔽性故障率[J].机械制造,2007,45(6):4-6. 被引量:2
  • 3王英,王文彬,方淑芬,吕文元.状态维修两阶段预知模型研究[J].哈尔滨工程大学学报,2007,28(11):1278-1281. 被引量:11
  • 4倪爱伟,谢里阳,翁刚,吴克勤.基于RCMⅡ和CCF理论的隐蔽性故障的新评价模型[J].东北大学学报(自然科学版),2008,29(1):105-108. 被引量:3
  • 5CHRISTER A H, WANG W, CHOI J M,et al. The de- lay-time modeling of preventive maintenance of plant given limited PM Data and Selective repair at PM [J].IMA J Math- sAppl Bus Ind 1998,9: 355-79.
  • 6WANG W. An inspection model for a process with two types of inspections and repairs [J].ReliabEngSystSaf,2009,94: 526-33.
  • 7CHAY S C, MAZUblDAR M. Determination of test intervals in certain repairable standby protective systems [J].IEEE Transactions on Reliability, 1975:201-205.
  • 8TANG T Q, LIND M, ANDREW K S. Jardine availability of asystem subject to hidden failure inspected ateonstant inter- vals with non-negligible downtime due to inspection and downtime due to repair/replacement [J]. Journal of Statistical Planning and Inference, 2013,143:176-185.
  • 9ELSAYED A.ELSAYED.可靠性工程[M].杨舟,译.北京:电子工业出版社,2013.
  • 10CHRISTER A H ,WALLER W M. Reducing production downtime using delay time analysis [J]. Journal of the Op- erational Research Society, 1984, 35(6 ) : 499-512.

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部