随着城市建设用地的日趋紧张,城市轨道交通的主变电站设置在地下将会是一种很好的解决方案。本文结合多年的工作经验,提出了地下主变电站设置方案,为主变电站的建设解决了难题。
As increasingly constraint of urban construction lands, to build main substation of urban rail transit (URT) under the ground should be a excellent solution, Based on the working experience for years, a new solution is raised in this paper, which would solve the difficulty in the construction ofmain substation.
出处
《电气化铁道》
2009年第3期46-47,共2页
Electric Railway
关键词
城市轨道交通
主变电站
设置方案
urban rail transit (URT)
main substation
solution