南水北调中线穿黄隧洞施工供水抽水试验研究 被引量:1

Experimental research of water pumping for water supply in construction of tunnel passing through the Yellow River of the middle route works of S-N water diversion project
下载PDF
导出
摘要 穿黄隧洞工程是南水北调中线工程总干渠的关键性工程,为保证施工用水,在黄河北岸施工供水水源地进行大口径抽水试验,确定含水层水文地质参数,为施工供水设计提供依据。通过稳定流、非稳定流理论计算,提出渗透系数k为16~18m/d,并用裘布依公式计算得出影响半径与经验公式计算结果接近,故影响半径推荐值为1113m,并根据开采试验,确定单井可开采水量为177m^3/h。 The tunnel project passing through the Yellow River is a key project of the middle route works of S-N water diversion project.In order to supply water for construction,water pumping experiment with large diameter of pumping hole was carried out in water sources area on the north bank to determine hydrological and geological parameter of aquifer and provide design base for design.Through theoretic calculation of steady and non-steady flows,the suggested permeability coefficient k is 16 to 18 m/d,the influence radius calculated by Dupuit formula is similar to the result of empirical formula,the suggested influence radius is 1113 m,and according to mining experiment,the minable water quantity for unit well is 177 m3/h.
作者 范子福 李锋
出处 《人民长江》 北大核心 2009年第11期8-9,36,共3页 Yangtze River
关键词 施工供水 抽水试验 水文地质参数 穿黄隧洞 南水北调中线 water supply for construction water pumping test hydro-geological parameters tunnel passing through the Yellow River the middle route works of S-N water diversion project
  • 相关文献

参考文献1

  • 1王大纯等.水文地质学基础.北京:地质出版社,1990.

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部