1[1]Ancona,D.G. (1990). Outward bound: Strategies for team survival in an organization. [J] Academy of Management Journal. 33(2): 334-365.
2[2]Ancona,D.g.&Caldwell,D.F.(1992):Bridging the boundary: external activity and performance in organizational teams. [J] Administrative science quarterly, 37:634-665.
3[3]Cohen,S.G, Bailey,D.E (1997): What makes teams work: group effectiveness research from the shop floor to the executive suite. [J] Journal of Management. Vol23 No3 239-290.
4[4]Hackman,J.R. (1987). The design of work teams. [C] Pp.315-342 in J.W.Lorsch(ED). Handbook of organizational behavior. Englewood Cliffs, NJ: Prentice-Hall.
5[5]Hambrick,D.C.&D'Aveni,R.A.(1992). Top team deterioration as part of the downward spiral of large corporate bankruptcies. [J] Management science,38(10):1445-1466.
6[6]Henderson,J.C.&Lee,S.(1992). Managing I/S design teams: A control theories perspective. [J] Management Science,38(6):757-777.
7[7]Keller,R.T.(1994):Technology-information processing fit and the performance of R&D project groups: A test of contingency theory. [J]Academy of management journal, 37:167-179.
8[8]Kim,Y.&Lee,B.(1995). R&D project team and team performance in Korea: A multidimensional approach.[J] R&D Management,25(2):179-196.
9[9]Klimoski, R.&Mohammed, S. (1994). Team mental model: Construct of metaphor? [J] Journal of Management Review. 19(2):195-229.
10[10]Levi,D.&Slem,,C.(1995). Team work in research-and-development organization: The characteristics of successful teams. International [J] Journal of industrial Ergonomics, 16(1):29-42.
8JONES M C,HARRISON A W. Research of project team performance: an empirical assessment [J]. Information and Management, 1996,20(31 ):57-65.
9SAWYER S. Effects of intragroup conflict on packaged software development team performance [J].Information System Journal, 2001( 11 ): 155-178.
10CAMPION M A, MEDSKER M. Relations between work group characteristics and effectiveness:implications for designing effective work groups [J]. Personnel Psychology,1994,46(4): 823-850.