摘要 在负荷上升较快且电网建设相对滞后的地区,建设35 kV临时变是解决供电供需矛盾比较理想的过渡方案。本文介绍了一种简易临时变,与广泛使用的箱式变电所相比,它具有较高的性价比,投资更省,占地更小,建设周期更短。全文介绍了简易临时变的特点,提出了问题,并对其存在问题提出了解决方案,为简易临时变更好发挥作用提供技术保障。 To build 35kV simple temporary substation is a relatively ideal interim scheme for solving power supply-demand contradiction in areas, where power grid construction can not satisfy the more increase of load. This paper introduces a kind of 35kV simple temporary substation, which has higher performance-price ratio, lower investment, smaller occupation of land, and shorter construction period compared with box-type substation. This paper describes characteristics of the simple temporary substation, as well as its existing defects and solution.
机构地区 浙江萧山供电局
出处 《电力系统保护与控制》 EI CSCD 北大核心 2009年第11期109-111,115,共4页 Power System Protection and Control
关键词 简易 临时变 介绍 simple temporary substation introduction
  • 相关文献

参考文献1

  • 1电力工程电气设计手册.第一册电气一次部分[M].北京:中国电力出版社,1989.

同被引文献16

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部