2Deng X T,,Zhang Y Z.Minimizing mean response time in batch processing[].Algorithmica.2004
3Lee,W-C.,Wu,C-C.,Sung,H-J.A bi-criterion single-machine scheduling problem with learning considerations[].Acta Inform.2004
4Brucker P,Gladky A,Hoogevreen H,et al.VandeVele Scheduling a batching machine[].Journal of Scheduling.1998
5Biskup,D.Single-machine scheduling with learning consideration[].European Journal of Operational Research.1999
二级参考文献5
1Brucker P, Gladky A, Hoogevreen H, et al. VandeVele Scheduling a batching machine. Journal of Scheduling, 1998, 1: 31~54.
2Chandru V, Lee C Y, Uzsoy R. Minimizing the totle completion time on batch processing machine. International Journal of Production Research, 1993, 31:2097~2121.
3Deng X T, Zhang Y Z. Minimizing mean Response time in batch processing. Algorithmica,2004 (to appear).