永久征地是南水北调征迁安置工作的一项重要工作内容,保定市在组织实施京石段永久征地工作过程中,针对所遇到的困难和问题,紧密结合当地实际,因地制宜,积极谋划对策,采取有效措施,认真加以研究解决,保证了工程建设用地需要,实现了控制性建筑物工程的早日开工,如期实现了辖区内工程全线开工建设。
Permanent land requisition is an important work in land requisition the South-to-North Water Diversion Project. Baoding city aims at solving the difficulties and problems during permanent land requisition based on local conditions, takes effective measures to guarantee the project land use to realize an early-starting of controlling structures and the projects launching on time.