摘要
保定市在京石段临时用地征用工作中,针对工作中遇到的问题,积极谋划对策,采取应对措施,千方百计完成了临时用地征用任务,保证了工程建设需要。
According to local conditions, Baoding city actively makes countermeasures to complete the mission for temporary land requisition to guarantee the requirement of the project construction.
出处
《南水北调与水利科技》
CAS
CSCD
2008年第A06期78-80,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
南水北调工程
临时用地征用
解决对策
the South-to-North Water Diversion Project, temporary land requisition, solution