南水北调中线工程征迁安置实施阶段投资控制探讨

The Investment Control in Resettlement Implementation Stage on Middle Route of the South-to-North Water Transfer Project
下载PDF
导出
摘要 由于南水北调工程征迁安置规划设计、审查批复和组织实施等几个阶段之间,相对跨越时间较长,造成影响实施阶段的投资变化因素较多。通过剖析京石段征迁安置实施阶段投资变化情况,调研其他工程,找出影响征迁安置实施阶段投资变化的主要因素,并针对这些因素进行深入分析,提出投资控制措施或建议,实现征迁安置实施阶段补偿投资的有效控制,以保证补偿资金兑付工作顺利进行。 Because the time intervals among planning and design stage, checking and approving stage, and organizing and implementation stage are very long in the South-to-North Water Transfer Project, the factors influencing the investment in the implementation state is much more than that in other projects. According to the investment changes in implementation stage in Jingshi section project and other projects, the main factors of investment are analyzed and the investment control measures and suggestions are put forward, which can control the investment effectively.
出处 《南水北调与水利科技》 CAS CSCD 2008年第A06期229-232,共4页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调 征迁安置 投资控制 the South-to-North Water Transfer Project resettlement investment control
  • 相关文献

参考文献7

  • 1国家发展改革委员会.关于核定南水北调中线京石段应急供水工程(石家庄至北拒马河段)初步设计概算的通知(发改投资[2004]2492号)[Z].2004.
  • 2水利部.关于南水北调中线京石段应急供水工程(石家庄至北拒马河段)初步设计的批复(水总[2004]605号)[Z].2004.
  • 3国家发展改革委员会.关于调增南水北调东、中线一期工程三阳河、潼河及宝应站等19项单项工程征地补偿投资概算的通知(发改投资[2005]520号)[Z].2005.
  • 4国务院南水北调工程建设委员会办公室.关于印发南水北调工程征地移民工作座谈会会议纪要的通知》(综环移[2005]11号)[Z].2005.
  • 5SL 290-2003,水利水电工程建设征地移民设计规范[S].
  • 6国务院南水北调工程建设委员会办公室.南水北调工程建设征地补偿和移民安置资金管理办法(试行)(国调办财经[2005339号)[Z].2005.
  • 7河北省人民政府.河北省南水北调中线干线工程建设征地拆迁安置暂行办法(冀政[2005]77号)[Z].2005.

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部