期刊文献+

电力市场环境下旋转备用费用分摊的新方法 被引量:15

A Novel Method for Cost Allocation of Spinning Reserve in Electricity Market Environment
下载PDF
导出
摘要 电力市场环境下,发电方、输电方和负荷方成为各自独立的经济实体。各方存在的风险因素都可能导致系统对旋转备用的需求,因此购买旋转备用的费用应由电力市场中存在风险因素的各方分摊。利用旋转备用损益期望值来评价旋转备用对具有风险因素的各市场参与方的价值,并按比例分摊旋转备用费用。最后,研究了改进算法效率的方法。算例分析验证了该旋转备用费用分摊方法的公平性、合理性和较好的可靠性激励作用。 In electricity market environment, power generation, transmission and consumption become self- governed economy entities. The risk elements for all market partners can result in the need for spinning reserve in power system. So the spinning reserve cost should be allocated among all three partners having risk elements. The spinning reserve's value for all the market partners having risk elements was evaluated by using the expectation of spinning reserve's gain or loss, and the reserve cost was allocated in proportion according to the spinning reserve's value for all the market partners. The means for improving the algorithm's efficiency was also discussed. Case study shows the rationality and equity of presented method, and its effect on encouraging all partners to raise the reliability of power system is also validated.
作者 齐先军 丁明
出处 《中国电机工程学报》 EI CSCD 北大核心 2009年第16期69-74,共6页 Proceedings of the CSEE
基金 国家重点基础研究发展计划项目(973项目)(2004CB217908)~~
关键词 费用分摊 旋转备用损益 价值 电力市场 cost allocation spinning reserve's gain or loss value electricity market
  • 相关文献

参考文献24

  • 1言茂松.当量电价体系及相关制度设计 (四)运行备用辅助服务的当量模式与定价方法[J].电力系统自动化,2003,27(12):1-6. 被引量:9
  • 2赵学顺,汪震,余志伟,文福拴,钟德成,钟志勇,黄民翔.电力市场中运行备用的获取和定价机制综述[J].浙江大学学报(工学版),2004,38(1):52-59. 被引量:14
  • 3葛炬,张粒子.备用服务A-S定价方法研究[J].中国电机工程学报,2006,26(14):31-35. 被引量:7
  • 4张国全,王秀丽,王锡凡.电力市场中旋转备用的效益和成本分析[J].电力系统自动化,2000,24(21):14-18. 被引量:55
  • 5Wu H, Gooi H B. Optimal scheduling of spinning reserve with ramp constraints[C]. IEEE Power Engineering Society 1999 Winter Meeting, NewYork, 1999.
  • 6Gooi H B, Mendes D P, Bell K R W, et al. Optimal scheduling of spinning reserve[J]. IEEE Transactions on Power Systems, 1999, 14(4): 1485-1492.
  • 7TsengC L, OrenS S, Svoboda A, et al. Price-based adaptive spinning reserve requirements in power system scheduling[J]. International Journal of Electrical Power and Energy Systems, 1999, 21(2): 137-145.
  • 8Bouffard F, Galiana F D. An electricity market with a probabilistic spinning reserve criterion[J]. IEEE Transactions on Power Systems, 2004, 19(1): 300-307.
  • 9Yu C W, Zhao X S, Wen F S, et al. Price and procurement of operating reserves in competitive poll-based electricity market[J]. .lournal of Electric Power Systems Research, 2005, 73(1): 37-43.
  • 10Song Z, Goel L, Wang P. Optimal spinning reserve allocation in deregulated power system[J]. IEEE Proceedings-Generation, Transmission and Distribution, 2005, 152(4): 483-488.

二级参考文献118

共引文献297

同被引文献210

引证文献15

二级引证文献276

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部