介绍了徐浦大桥主桥安装监理的情况,并叙及徐浦大桥混合结构斜拉桥的构造和施工特点。
Erection supervision of main spans of Xupu Bridge which is a composite cablestayed bridge is introduced.The structure of the bridge and the key points in the construction are also presented.