摘要
按订单装配生产模式是近年来企业为了赢得竞争采用的主要生产模式,也是学术界研究的重点之一,文章介绍了按订单装配生产模式的特点,系统地总结了目前关于按订单装配的主要研究成果,最后提出未来的研究方向。
出处
《现代管理科学》
CSSCI
2009年第6期98-99,102,共3页
Modern Management Science
基金
国家自然科学基金(70772065)
参考文献9
-
1Akcay, Y., Xu, S. H. Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-Order System. Management Science, 2004,50(1):99-116.
-
2Bollapragada, R., Rao, U., Zhang, J. A decomposition approach for managing assembly systems with demand and supply uncertainty. Management Science, 2004, (50): 1729-1743.
-
3Fong, D. K. H., Fu, H. Z., Li, Z. L. Efficiency in shortage reduction when using a more expensive common component. Computers & Operations Research, 2004, 31(1): 123-138.
-
4Fu, K., Hsu, V., Lee, C. Inventory and production decision for an assemble-to-order system with uncertain demand and limited assemble capacity. Operations Research, 2006,54(6):1137-1150.
-
5Hsu, N., Lee, C., So, K. Optimal component stocking policy for assemble-to-order systems with lead-time-dependent component and product pricing. Management Science, 2006,52(3):337-351.
-
6Lu, Y. D., Song, J. S. Order-Based Cost Optimization in Assemble-to-Order Systems. Operations Research, 2005,53(1):151-169.
-
7Plambeck, E. L. Ward, A.R. Note: A Separation Principle for a Class of AssembletoOrder Systems with Expediting. Operations Research,2007, 55(3): 603-609,611-612.
-
8Zhang, X. H., Ou, J. H., Gilbert, S. M. Coordination of stocking decisions in an assemble-to-order environment. European Journal of Operational Research, 2008,189(2):540.
-
9Zhao, Y., Simchi-Levi, D. Performance Analysis and Evaluation of hssemble-to-Order Systems with Stochastic Sequential Lead Times. Operations Research, 2006, 54(4): 706-724,810-811.
同被引文献14
-
1王章辉.试从比较研究的角度看工业革命研究中的几个问题[J].史学理论研究,1997(2):113-120. 被引量:3
-
2李黎,成晔,袁守华.基于MES的生产车间管理信息系统[J].现代制造工程,2005(4):130-132. 被引量:17
-
3鲁玉军,祁国宁.基于MC环境的面向订单产品设计方法研究[J].中国机械工程,2006,17(22):2354-2359. 被引量:20
-
4Joseph MLAB. Pine II. Mass Customization: The New Frontier in Business Competition. Boston, Mass: Harvard Business School Press, 1993.
-
5Lee DY, DiCesare F. Scheduling flexible manufacturing systems using Petri nets and heuristic search. IEEE Trans. on Robotics and Automation, 1994,10(2): 123-132.
-
6Lenort R, Klepek R, Samolejova A, et al. Production paths-an innovative concept for heavy machinery production planning and control. Metalurgija, 2014, 53(1): 78-80.
-
7Yuan K J, Chang SH, Li RK. Enhancement of theory of constraints replenishment using a novel generic buffer management procedure. International Journal of Production Research, 2003, 41(4): 725-740.
-
8王蒲生,杨君游,李平,张宇.产业哲学视野中全球生产方式的演化及其特征——从福特制、丰田制到温特制[J].科学技术与辩证法,2008,25(3):96-101. 被引量:29
-
9雷霏,王昌咏,王俊.大规模生产与大规模定制企业组织结构比较研究[J].当代经济,2012(7):50-52. 被引量:7
-
10翟丽丽,王欢,祁凯,吴飞.面向大规模定制的柔性生产计划研究[J].计算机应用研究,2012,29(7):2544-2548. 被引量:12
-
1李宇雨.按订单装配企业产品族定价策略研究[J].现代管理科学,2013,1(5):115-117.
-
2姚向华,施仁.按订单装配型产品配置器的方案求解研究[J].机床与液压,2003,31(5):219-222. 被引量:7
-
3刘艳梅,任佳,江支柱,刘曦泽,祁国宁.大批量定制下按订单装配产品同步生产计划方法[J].计算机集成制造系统,2014,20(6):1352-1358. 被引量:3
-
4鲁玉军,钟文明,祁国宁.按订单装配型定制产品配置设计过程研究[J].机电工程,2008,25(5):24-28. 被引量:4
-
5姚向华,葛思擘,施仁.约束编程与约束满足在产品装配中的应用[J].计算机应用,2003,23(1):60-62. 被引量:1
-
6单汨源,黎斌,袁际军.面向配置的逻辑产品结构模型及其知识表示[J].科学技术与工程,2007,7(17):4321-4326.
-
7雒兴刚,汪定伟,姜慧研,陈东明.基于Tabu搜索算法的产品族配置问题研究[J].系统仿真学报,2006,18(5):1131-1135. 被引量:2