期刊文献+

深海钢悬链立管触地点动力响应分析 被引量:16

Dynamic response analysis of a deepwater steel catenary riser at the touchdown point
下载PDF
导出
摘要 研究深海钢悬链立管(SCR)在海洋环境载荷作用下的动力响应。利用非线性弹簧模拟立管与海床触地点的耦合模型,通过模态分析得到钢悬链立管的动力特性参数;时域动力响应分析获得不同工况下触地点及典型部位的位移、弯矩和应力时程。比较分析表明:浮体垂荡运动对触地点的应力状态影响较大,触地点附近存在钢悬链立管动力响应过程中的位移极值点和弯矩极值点。所提方法为触地点区域模拟分析提供了新思路,给出的分析结论对钢悬链立管设计有一定借鉴意义。 This paper presents dynamic response of a deepwater steel catenary riser (SCR) under anlbient excitations. The nonlinear spring is used to simulate the soil-riser interaction in the touchdown point (TDP). The SCR's dynamic characteristic parameters have been obtained by modal analysis. Dynamic response features of the SCR in different operation conditions have been acquired by transient analysis. According to the comparative analysis, it shows that the vessel heave greatly affects the stress of touchdown point, extreme value of displacement and bend- ing moment occurs near the touchdown zone. In conclusion, the proposed approach provides a new strategy to simulate the TDP and the research results are helpful to the SCR's design.
出处 《海洋工程》 CSCD 北大核心 2009年第2期36-40,45,共6页 The Ocean Engineering
基金 国家自然科学重点基金资助项目(50739004) 高等学校博士学科点基金资助项目(20070248104)
关键词 钢悬链立管 触地点 动力响应 非线性弹簧 steel catenary riser touchdown point dynamic response nonlinear spring
  • 相关文献

参考文献10

  • 1黄维平,李华军.深水开发的新型立管系统——钢悬链线立管(SCR)[J].中国海洋大学学报(自然科学版),2006,36(5):775-780. 被引量:60
  • 2Thethi R,Moros T.Soil interaction effects on simple catenary riser response[A].In:Proc.of the 2001 Deepwater Pipeline & Riser Technology Conference[C].Houston:[s.n.],2001:1-24.
  • 3Pesce C P,Aranha J A P,Martins C A.Dynamic curvature in catenary risers at the touch-down point region:an experimental study and the analytical boundary-layer solution[J].International Journal of Offshore and Polar Engineering,1998,8(4):302-310.
  • 4Ong P P A,Pellegrino S.Modelling of seabed interaction in frequency domain analysis of moorin cabl s[A].In:Proc.of the 22nd International Conference on Offshore Mechanics and Arctic Engineering[C].Cancun:[s.n.],2003:OMAE 37465.
  • 5Bridge C,Laver K,Clukey E,et al.Steel catenary riser touchdown point vertical interaction models[A].In:Proc.of the 2004 Off shore Techonlogy Conference[C].Houston:[S.n.],2004:OTC 16628.
  • 6Aubeny C P,Biscontin G,Zhang J.Seafloor-Riser Interaction Model[A].In:PrDc.of the 2007 International Workshop on Constitutive Modelling-Develolmlent,Implementation,Evaluation,and Application[C].Hong Kong:[s.n.],2007:12-13.
  • 7程泽坤.基于P-Y曲线法考虑桩土相互作用的高桩结构物分析[J].海洋工程,1998,16(2):74-83. 被引量:18
  • 8缪国平.挠性部件力学导论[M].上海:上海交通大学出版社,1996.
  • 9周宏杰,闫澍旺,孙国民.复杂条件下双层立管的有限元分析[J].海洋工程,2004,22(1):74-79. 被引量:5
  • 10You J H,Aubeny C P,Biscontin G.Seafloor interaction with steel catenary risers[A].In:Proc.of the 26th International Conference on Offshore Mechanics and Arctic Engineering[C].San Diego:[s.n.],2007:10-15.

二级参考文献27

  • 1Det norske Veritas. Rules for submarine pipeline systems[M].Det norske Veritas, Oslo, 1981.
  • 2Martins C A,Higashi E.A parametric analysis of steel catenary risers:Fatigue behavior near the top[C].// Proceedings of the International Offshore and Polar Engineering Conference.USA:ISOPE,2000,2:54-59.
  • 3Anthi Miliou,Spencer J Sherwin,J Michael R Graham.Fluid dynamic loading on curved riser pipes[J].Journal of Offshore Mechanics and Arctic Engineering,2003,125(3):176-182.
  • 4Roderick Y Edwards,Jr Remo Zauli,Machado Filho,et al.Load monitoring at the touch down point of the first Steel Catenary riser installed in a deepwater moored semi-submersible platform[C].// Proceedings-Offshore Technology Conference.USA:OTC,1999,2:295-303.
  • 5Ricardo Franciss,Elton Ribeiro.Analyses of a large diameter steel lazy wave riser for ultra deepwater in Campos Basin[C].// Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering.Canada:ASME,2004,1:355-361.
  • 6Kjell Morisbak Lund,Petter Jensen,Daniel Karunakaran,et al.A steel catenary riser concept for Statfjord C[C].// Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering.Portugal:ASME,1998:98-1361.
  • 7Nygard M K,Sele A,Lund K M.Design of a 25.5-in titanium catenary riser for the Asgard B platform[C].// Proceedings-Offshore Technology Conference.USA:OTC,2000,3:343-354.
  • 8Gautam Chaudhury,Jonathan Kennefick.Design,testing and installation of steel catenary risers[C].// Proceedings-Offshore Technology Conference.USA:OTC,1999,2(2):339-346.
  • 9Gore C T,El Paso,Basim B Mekha.Common sense requirements (CSRs) for steel catenary risers (SCRs)[C].// Proceedings Offshore Technology Conference.USA:OTC,2002:14153.
  • 10Douglas R Korth,Bob Shian J Chou,Gary D McCullough.Design and implementation of the first buoyed steel catenary risers[C].// Proceedings Offshore Technology Conference.USA:OTC,2002:14152.

共引文献91

同被引文献130

引证文献16

二级引证文献93

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部