论阿哈水库红粘土隔水斜墙的“阿哈效应”

Re - examination of Impermeablity of the inclined Dam WallBuilt in the Aha Reservoir of Guiyang City, Guizhou
下载PDF
导出
摘要 贵阳市阿哈水库始建于1958年,主要由贵阳市民参加义务劳动修建,缺乏施工机械,工期短,红粘土隔水斜墙的填筑质量较差,但已正常运行36年,并经历了1991、1996年特大洪水,通过首次质量检验认为:阿哈水库红粘土斜墙是隔水的、稳定的,仍具备继续正常运行的基本条件。 The dam of the Aha reservoir built in 1958 was thought to be poor in fillingquality thanks to its construction ahead of schedule in the case of lacking necessary equipment andfacility and almost with the help of volunteers. After its serving for 36 years, especially suffering fromtwo abnormal floods of 1991 and 1996 in historic time, the dam was re - examined by moderntechniques. This paper presents a conclusion on its engineering evaluation.
作者 徐榴胜
出处 《贵州地质》 1998年第2期182-188,共7页 Guizhou Geology
  • 相关文献

参考文献3

二级参考文献6

  • 1王继庄.游离氧化铁对红粘土工程特性的影响[J]岩土工程学报,1983(01).
  • 2刘径迪,王金汉.鲁布革水电站土石坝施工[J]水力发电,1988(12).
  • 3刘径迪,王金汉.鲁布革水电站土石坝施工[J]水力发电,1988(12).
  • 4卞富宗.红土作为筑坝土料的特性研究[J]水利学报,1980(04).
  • 5林明华,谈国良,张继骞.世界水电建设现状及展望[J].水力发电,1990,17(12):35-44. 被引量:1
  • 6徐榴胜.红粘土在贵州水利工程中的应用[J].贵州地质,1991,8(2):163-173. 被引量:3

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部