摘要
以贵州省普定县后寨地下河流域内平山天窗水位为研究对象,分析了水位变化规律,并采用偏最小二乘回归、人工神经网络及两种方法的结合建立了高水位阶段水位半日预测模型,对各模型进行了对比分析。结果表明:天窗水位变化划分为枯水位、开采-恢复、高水位3个阶段;高水位阶段天窗水位主要受前半日内的降雨及前半日时的水位影响;偏最小二乘回归是进行天窗水位预测的合适方法。该研究有助于岩溶地区水循环规律的认识及地下河水资源的开发利用。
The rainfall water level fluctuation of underground rivers' sinkhole in karst area of the Pingshan County, Guizhou Province, China, was analyzed. It is found that the variation of water level can be divided into three phases including the low water level phase, exploitation-restoration stage water level phase and high water level phase. It is affected by the earlier stage rainfall within 12 h and corresponding water level. The models for forecasting semidiumal high water level based on partial least squares regression method, artificial neural network method and the combination of these two methods were established respectively. Comparison of the results of these three models shows that the model based on partial least squares regression method is the best.
出处
《水利学报》
EI
CSCD
北大核心
2009年第5期529-534,共6页
Journal of Hydraulic Engineering
基金
国家"973计划"(2006CB403204)
关键词
岩溶
地下河天窗
偏最小二乘回归
人工神经网络
水位预测
karst area
sinkhole of underground river
partial least squares regression
artificial neural network
water level forecast