腈纶110 kV总降保护装置、开关柜等设备都是早期产品,存在较大的安全隐患,影响到生产装置的安全稳定供电;原有的2台50 MW变压器满足不了公司新建项目供电需要,因此公司决定对腈纶110 kV进行扩容和综合自动化改造,新增两台40 MW变压器、控制系统采用RCS—9700,满足了生产和安全需要。
The equipment of Jing Lun 110KV transformer substation has been old and aging, the relay protector and switch ark equipment are early production, which have safe peril and touch the equipment of production, as well as the two inherent 50MVA transformer ,which do not satisfy the requirement of new project,so the company decides to recon- struct and enlarge capacity to the Jing Lun ll0KV transformer substation,increase two 40MVA transformer and adopt RCS - 9700 control system to satisfy the needness of the production and its safety.