摘要
结合客运专线某桥工程的特点,对大临工程分布及总体设计、全桥施工方案的总体部署、主桥工期,以及客运专线桥梁施工的主要关键技术等进行探讨。
In the light of the construction characteristics of a bridge on passenger dedicated railway, this paper makes a study of the layout and overall design of the large temporary works, overall arrangement of the construction schemes for whole bridge, construction time schedule of the main bridge as well as the principal key techniques for construction of the type of the bridge.
出处
《世界桥梁》
北大核心
2009年第2期72-74,共3页
World Bridges
关键词
客运专线桥梁
施工组织设计
探讨
passenger dedicated railway bridge
construction organization design
study