摘要
本文概述了深圳市宝安区石岩河人工湿地二期工程的工程概况和工艺调试内容,介绍了石岩河人工湿地工艺调试的过程,阐明了工艺调试的效果和运行模式,分析了工程运行的电费成本,得出了工艺调试和运行的结论,并提出了改进工艺的建议。
In this paper, the construction and starting up of the second phased project of Shiyan river constructed wetland in Bao'an district of Shenzhen including the starting effect and operational mode were briefly introduced. The cost of electricity was analyzed and conclusion of starting up and operation were obtained. Some suggestions to improve the technology were proposed as well.
出处
《四川环境》
2009年第3期100-104,共5页
Sichuan Environment
关键词
石岩河人工湿地
工艺调试
运行效果
运行模式
Constructed wetland of Shiyan river
starting up
operational effects
operational mode