石岩河人工湿地二期工程工艺调试及运行

Starting up and Operation of the Second Phased Projects of Shiyan River Constructed Wetland
下载PDF
导出
摘要 本文概述了深圳市宝安区石岩河人工湿地二期工程的工程概况和工艺调试内容,介绍了石岩河人工湿地工艺调试的过程,阐明了工艺调试的效果和运行模式,分析了工程运行的电费成本,得出了工艺调试和运行的结论,并提出了改进工艺的建议。 In this paper, the construction and starting up of the second phased project of Shiyan river constructed wetland in Bao'an district of Shenzhen including the starting effect and operational mode were briefly introduced. The cost of electricity was analyzed and conclusion of starting up and operation were obtained. Some suggestions to improve the technology were proposed as well.
出处 《四川环境》 2009年第3期100-104,共5页 Sichuan Environment
关键词 石岩河人工湿地 工艺调试 运行效果 运行模式 Constructed wetland of Shiyan river starting up operational effects operational mode
  • 相关文献

参考文献4

  • 1雷志洪,彭立新.石岩河人工湿地污水处理二期工程可行性研究报告[R].深圳:深圳市环境科研所、中冶集团长沙冶金设计研究院深圳分院,2004.
  • 2雷志洪,彭立新.石岩河人工湿地污水处理二期工程初步设计[R].深圳:深圳市环境科研所、中冶集团长沙冶金设计研究院深圳分院,2004.
  • 3王洪臣.城市污水处理厂运行控制与维护管理[M].北京:科学出版社,2002.
  • 4沈耀良,王宝贞.废水生物处理新技术-理论与实践[M].北京:中国环境科学出版.2000.

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部