摘要
研究了受控核聚变负载条件下的1MW大功率GTO直流斩波器,并采用EMTP(ElecrtoMagneticTransientProgram)程序对GTO的暂态过程进行了动态模拟,同时在HT-6M托卡马克装置上成功地进行了实验,为今后大功率GTO直流斩波器的设计和使用提供了重要的理论分析和实验经验。
n condition that load of the nuclear fusion,the 1 MW high power GTO DC chopper is studied.The transient Process of GTO is modeled by the EMTP(Electro Magnetic Transient Program),and the experiment is done successfully in the HT 6M Tokamak.The important theory analysis and exeperience are provided for the high power GTO DC choppet engineering and using.
出处
《电工技术学报》
EI
CSCD
北大核心
1998年第3期51-54,共4页
Transactions of China Electrotechnical Society