石泉电厂二号水轮发电机组检修测试与分析

Test and Analysis for Repairing of No.2 Turbine Generator Unit in Shiquan Hydropower Plant
下载PDF
导出
摘要 对石泉水电厂二号水轮发电机组抢修前后进行了论述,并通过测试、分析与处理,降低了机组各处的摆度及振动,保证了二号机组的正常稳定运行。最后,对现存问题提出了可行性建议。 The repairing process of No.2 turbine generator unit in Shiquan Hydropower Plant was expounded in this paper. The shaking and vibrating of the unit were subsided by treatment to ensure the normal operation, the treatment was based on the testing and analysis. Finally, suggestions with feasibility base were put forward for the existed problems.
出处 《陕西水力发电》 1998年第2期21-24,共4页 Journal of Shaanxi Water Power
关键词 水轮发电机组 测试 摆度 振动 检修 水电厂 Turbine generator unit, Testing, Shaking, Vibrating