期刊文献+

基于数据的复杂制造过程调度 被引量:6

Data-based Scheduling for Complex Manufacturing Processes
下载PDF
导出
摘要 现代制造企业规模庞大、过程复杂等特征给制造过程的调度决策带来了极大的挑战.一方面,使用传统方法建立指导生产过程调度的精确数学模型变得越来越困难;另一方面,因缺乏准确、及时的模型参数而往往导致低下的模型使用效果.在此情况下,基于数据–信息–知识–决策的信息提炼轨迹,有必要探寻新的基于数据的复杂制造过程的调度理论与方法.在综述国内外相关研究的基础上,提出了由数据层与模型层构成的基于数据的复杂制造过程调度架构,并对该结构框架下的相关理论、方法及实施技术进行了探讨. Large manufacturing scale and process complexity of modern manufacturing companies are posing great challenges to production scheduling. On the one hand, it becomes more and more difficult to build accurate mathematical scheduling models for manufacturing processes based on conventional methods; on the other hand, the lack of accurate and real-time parameters of scheduling models may lead to low effectiveness of these models. Therefore, following the information-extraction path of data-information-knowledge-decision, it is necessary to explore innovative theories and methodologies of data-based scheduling for complex manufacturing processes. In this paper, based on systematic research of related works worldwide, a data-based scheduling framework composed of a data layer and a model layer for complex manufacturing processes is proposed. Related theories, methodoloies, and technologies for this scheduling framework are discussed as well.
出处 《自动化学报》 EI CSCD 北大核心 2009年第6期807-813,共7页 Acta Automatica Sinica
基金 国家自然科学基金重点项目(70531020) 国家教育部新世纪优秀人才支持计划项目(NCET-07-0622) 教育部博士点基金新教师课题(20070247007)资助~~
关键词 基于数据 调度 复杂制造过程 调度框架 调度模型 Data-based, scheduling, complex manufacturing processes, scheduling framework, scheduling model
  • 相关文献

参考文献7

二级参考文献33

  • 1Seligman L,Rosenthal A,Lehner P,et al.Data integration:where does the time go[J].IEEE Data Engineering Bulletin,2002,25(3):3-10.
  • 2Bernstein P,Bergstraesser T.Meta-data support for data transformations using microsoft repository[J].IEEE Data Engineering Bulletin,1999,22(1):9-14.
  • 3Borkar V,Deshmuk K,Sarawagi S.Automatically extracting structure from free text addresses[J].IEEE Data Engineering Bulletin,2000,23(4):27-32.
  • 4Haas L M,Miller R J,Niswonger B,et al.Transforming heterogeneous data with database middleware:beyond integration[J].IEEE Data Engineering Bulletin,1999,22(1):31-36.
  • 5Davidson S B,Kosky A S.Specifying database transformation in WOL[J].IEEE Data Engineering Bulletin,1999,22(1):25-30.
  • 6王超,机械可靠性工程,1992年
  • 7郑玉华,吉林工业大学学报,1998年,28卷,3期,47页
  • 8Parepinelli R S,Lopes H S,Freitas A. An Ant Colony Algorithm for Classification Rule Discovery. In H. A. a. R. S. a. C. Newton (Ed.),Data Mining: Heuristic Approach: Idea Group Publishing ,2002.
  • 9Bonabeau E,Dorigo M,Theraulaz G. Swarm Intelligence: From Natural to Artificial Systems. New York: Oxford University Press,1999.
  • 10Dorigo M,Maniezzo V. The Ant System: Optimization by a Colony of Cooperating Agents. IEEE Transactions on Systems,Man,and Cybernetics,1996,26(1): 1-13.

共引文献23

同被引文献65

引证文献6

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部