沉降后浇带封闭时间分析 被引量:11

Closing Time Analysis of Post-subsidence Pouring Belt
下载PDF
导出
摘要 后浇带的封闭时间与工期之间存在矛盾。为合理解决这一矛盾,做到在建筑物适宜位置设置后浇带,既释放掉单元间的混凝土收缩应力和不均匀沉降,又缩短工期,为施工创造良好条件。实际工程中,可以综合考虑理论沉降量与实测沉降量的比值、实际加载量与建筑最终荷载的比值、沉降发展等因素,经地基基础优化设计,合理调整不同部位间的沉降差,完全可以提前封闭沉降后浇带。 In order to solve the contradiction between dosing time of post-subsidence pouting belt and constmction period, setting post-pouring belt in suitable location of building can not only release shrinkage stress of concrete element and uneven settlement but also shorten construction period, which can provide good conditions for building construction. At practical engineering, by comprehensively considering some factors of the ratio of theoretical value and actual value of settlement, the ratio of actual loading and the final loading and settlement developing, as well as optimizing basement design to reasonably adjust settlement difference of different location, the dosing time of post-subsidence pouring belt is advanced.
出处 《施工技术》 CAS 北大核心 2009年第6期94-95,共2页 Construction Technology
关键词 后浇带 封闭时间 工期 建筑施工 post-peuring belt closing time construction period building construction
  • 相关文献

参考文献2

二级参考文献3

  • 1JGJ6-99高层建筑箱形筏形基础技术规范[S]
  • 2迟铃泉,刘金砺.高层建筑地基基础与上部结构共同工作计算中桩土变形计算及工程应用[C]∥岩土工程青年专家学术论坛文集,北京:中国建筑工业出版社,1998
  • 3刘金砺,迟铃泉.桩土变形计算模型和变刚度调平设计[J].岩土工程学报,2000,22(2):151-157. 被引量:126

共引文献109

同被引文献57

引证文献11

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部