期刊文献+

不确定条件下汽油调和调度的鲁棒优化模型(英文) 被引量:5

A ROBUST OPTIMIZATION MODEL FOR GASOLINE BLENDING SCHEDULING UNDER UNCERTAINTY
下载PDF
导出
摘要 汽油调和是炼油企业最重要的操作,也是企业控制产品质量、降低生产成本的关键一步。然而汽油调和生产过程中往往面临诸多不确定因素,如:产品需求存在不确定性,调和组分的物性会出现波动。这些不确定因素为汽油生产调度带来挑战。为了应对这种挑战,提出了一种鲁棒优化模型。在不确定条件下,该模型所产生的调度策略能保证产品需求和产品质量要求得到最大程度的满足。该鲁棒模型的特点是,能处理既有连续概率分布参数又有离散概率分布参数的情形。另外,该模型并不采用场景遍历的方式来处理连续概率分布参数,这样就减小了模型规模,增强其应用于实际问题的能力。最后通过实验验证了该模型的效果。 Gasoline blending and scheduling is the last and important operation in a refinery. It is also the last chance to improve the quality of products and to reduce the production costs. Product producing and blending are always faced with uncertainty, such as uncertain demand for products and fluctuation of properties of blending components. A robust optimization model is used for product blending and scheduling to ensure that the final product can meet the requirements of quality and demand, which can deal with the situation of uncertain parameters with both continuous probability distribution and discrete probability distribution. At the same time, the model can avoid enumerating scenarios for uncertain parameters of continuous probability distribution, which are the drawbacks of scenario-based approaches for practical problems with a large number of uncertain parameters. Finally, an example is used to demonstrate the performance of the presented model and algorithm.
作者 罗春鹏 荣冈
出处 《石油学报(石油加工)》 EI CAS CSCD 北大核心 2009年第3期391-400,共10页 Acta Petrolei Sinica(Petroleum Processing Section)
基金 国家自然科学基金项目(60421002)资助
关键词 鲁棒优化 短期调度 调和 炼油企业 robust optimization short-term scheduling blending refinery
  • 相关文献

参考文献12

  • 1TILL J,SAND G,URSELMANN M,et al.A hybrid evolutionary algorithm for solving two-stage stochastic integer programs in chemical batch scheduling[J].Comput Chem Eng,2007,31(5):630-647.
  • 2VIN J P,IERAPETRITOU M G.Robust short-term scheduling of multiproduct batch plants under demand uncertainty[J].Ind Eng Chem Res,2001,40(21):4543-4554.
  • 3BONFILL A,ESPU A A,PUIGJANER L.Addressing robustness in scheduling batch processes with uncertain operation times[J].Ind Eng Chem Res,2005,44(5):1524-1534.
  • 4ADHITYA A,SRINIVASAN R,KARIMI I A.Heuristic Rescheduling of Crude Oil Operations to Manage Abnormal Supply Chain Events[EB].Wiley InterScience,http://www.interscience.wiley.com,2007.
  • 5JANAK S L,FLOUDAS C A,KALLRATH J,et al.Production scheduling of a large-scale industrial batch plantⅡReactive scheduling[J].Ind Eng Chem Res,2006,45(25):8253-8269.
  • 6CHENG I,SUBRAHMANIAN E,WESTERBERG A W.A comparison of optimal control and stochastic programming from a formulation and computation perspective[J].Comput Chem Eng,2004,29(1):149-164.
  • 7SOVAN M.White Paper on Scenario Generation for Stochastic Programming[EB].http://www.optirisk-systems.com/does/whitepaper/SGwhitepaper.pdf,2006.
  • 8SAHINIDIS N V.Optimization under uncertainty:state-of-the-art and opportunities[J].Comput Chem Eng,2004,28(6):971-983.
  • 9MULVEY J M,VANDERBEI R J,ZENIOS S A.Robust optimization of large-scale systems[J].Operations Research,1995,43(2):264-281.
  • 10LEUNG S C H,TSANG S O S,NG W L,et al.A robust optimization model for multi-site production planning problem in an uncertain environment[J].European Journal of Operational Research,2007,181(1):224-238.

同被引文献32

引证文献5

二级引证文献66

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部