期刊文献+

某银行计算机中心电气故障解决案例

Solution Case for the Electrical Fault in a Bank Computer Center
下载PDF
导出
摘要 介绍了某银行计算机中心电气故障的分析过程和解决措施。UPS保护开关连同外部保护开关多次发生故障跳闸,分析其原因为:①TN-C-S系统中N线与PE线分开后又合并;②三相负荷不平衡;③谐波影响。 The analysis process and solutions for the electrical fault in a bank computer center are introduced. UPS switch along with the external protection switch tripped many times because of fault, the causes of which are that: (1) the N conductor and the PE conductor in the TN-C-S system are first separated and then combined; (2)three-phase load is unbalanced; (3) harmonic impact.
出处 《建筑电气》 2009年第6期19-20,共2页 Building Electricity
关键词 电气故障 接地 三相负荷不平衡 N线对地电压 中性点偏移 谐波 Electrical fault Grounding Threephase load unbalance Voltage between N conductor and ground Neutral point offset Harmonics
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部